Using OEM Information to Create a PM Program

Everyone says “according to manufacturer’s recommendations” when writing preventive maintenance tasks, but in reality, how often are the OEM-Original Equipment Manufacturer’s recommendations actually followed? When writing a PM program, it should become standard practice to consult the installation, startup, and operation documentation that came with the equipment.

More often than should be the case, the original OEM material is not with the equipment, and it is nowhere to be found on site. So, what do you do when the OEM’s aren’t onsite? Write down as much information you can find on the equipment including model number, serial number, amperage, voltage, etc. and consult the following sources:

1. go to the manufacturer’s website

2. call your local manufacturer’s representative

3. consult a third-party engineering firm to write your program for you

Finally, keep a library of your preventive maintenance tasks for future reference.  If you have a PM written for a specfic type of pump, fan, motor, or other piece of equipment, and you later acquire a contract that has that same piece of equipment, you can use the one you have. I prefer to call this my “best practices” book, and I keep both a digital copy, and a hard copy for reference when writing new programs.